当前位置: 首页 > 知识库问答 >
问题:

周一开始日历

牛经赋
2023-03-14

我在本教程的帮助下制作了日历:http://droidwalk.blogspot.it/2012/11/android-calendar-sample.html ..但是这个日历从星期天开始,我想从星期一开始。。我试图改变价值观​​在函数中设置对象GregorianCalendar,但它不会给出所需的结果。本周从周一开始,但在某些月份,我们失去了第一周。我发现了一个类似的问题:从周一开始制作日历,但没有解决方案。如果有人有任何想法,请帮忙。

日历视图。JAVA

public GregorianCalendar month, itemmonth;// calendar instances.

public CalendarAdapter adapter;// adapter instance
public Handler handler;// for grabbing some event values for showing the dot
                        // marker.
public ArrayList<String> items; // container to store calendar items which
                                // needs showing the event marker

public void onCreate(Bundle savedInstanceState) {
    super.onCreate(savedInstanceState);
    setContentView(R.layout.calendar);
     Locale.setDefault( Locale.US );
    month = (GregorianCalendar) GregorianCalendar.getInstance();
    itemmonth = (GregorianCalendar) month.clone();

    items = new ArrayList<String>();
    adapter = new CalendarAdapter(this, month);

    GridView gridview = (GridView) findViewById(R.id.gridview);
    gridview.setAdapter(adapter);

    handler = new Handler();
    handler.post(calendarUpdater);

    TextView title = (TextView) findViewById(R.id.title);
    title.setText(android.text.format.DateFormat.format("MMMM yyyy", month));

    RelativeLayout previous = (RelativeLayout) findViewById(R.id.previous);

    previous.setOnClickListener(new OnClickListener() {

        @Override
        public void onClick(View v) {
            setPreviousMonth();
            refreshCalendar();
        }
    });

    RelativeLayout next = (RelativeLayout) findViewById(R.id.next);
    next.setOnClickListener(new OnClickListener() {

        @Override
        public void onClick(View v) {
            setNextMonth();
            refreshCalendar();

        }
    });

    gridview.setOnItemClickListener(new OnItemClickListener() {
        public void onItemClick(AdapterView<?> parent, View v,
                int position, long id) {

            ((CalendarAdapter) parent.getAdapter()).setSelected(v);
            String selectedGridDate = CalendarAdapter.dayString
                    .get(position);
            String[] separatedTime = selectedGridDate.split("-");
            String gridvalueString = separatedTime[2].replaceFirst("^0*",
                    "");// taking last part of date. ie; 2 from 2012-12-02.
            int gridvalue = Integer.parseInt(gridvalueString);
            // navigate to next or previous month on clicking offdays.
            if ((gridvalue > 10) && (position < 8)) {
                setPreviousMonth();
                refreshCalendar();
            } else if ((gridvalue < 7) && (position > 28)) {
                setNextMonth();
                refreshCalendar();
            }
            ((CalendarAdapter) parent.getAdapter()).setSelected(v);

            if(selectedGridDate.equals("2013-06-20")) //mettergli confronto con date evento
                setContentView(R.layout.activity_inizio);


        }
    });
}

protected void setNextMonth() {
    if (month.get(GregorianCalendar.MONTH) == month
            .getActualMaximum(GregorianCalendar.MONTH)) {
        month.set((month.get(GregorianCalendar.YEAR) + 1),
                month.getActualMinimum(GregorianCalendar.MONTH), 1);
    } else {
        month.set(GregorianCalendar.MONTH,
                month.get(GregorianCalendar.MONTH) + 1);
    }

}

protected void setPreviousMonth() {
    if (month.get(GregorianCalendar.MONTH) == month
            .getActualMinimum(GregorianCalendar.MONTH)) {
        month.set((month.get(GregorianCalendar.YEAR) - 1),
                month.getActualMaximum(GregorianCalendar.MONTH), 1);
    } else {
        month.set(GregorianCalendar.MONTH,
                month.get(GregorianCalendar.MONTH) - 1);
    }

}

protected void showToast(String string) {
    Toast.makeText(this, string, Toast.LENGTH_SHORT).show();

}

public void refreshCalendar() {
    TextView title = (TextView) findViewById(R.id.title);

    adapter.refreshDays();
    adapter.notifyDataSetChanged();
    handler.post(calendarUpdater); // generate some calendar items

    title.setText(android.text.format.DateFormat.format("MMMM yyyy", month));
}

public Runnable calendarUpdater = new Runnable() {

    @Override
    public void run() {
        items.clear();

        // Print dates of the current week
        DateFormat df = new SimpleDateFormat("yyyy-MM-dd",Locale.US);
        String itemvalue;
        for (int i = 0; i < 7; i++) { //AL POSTO DI SETTE METTERE IL NUMERO DEGLI EVENTI
            itemvalue = df.format(itemmonth.getTime());
            itemmonth.add(GregorianCalendar.DATE, 1);
            items.add("2013-06-21"); //METTERE DATE EVENTI
            items.add("2012-10-07");
            items.add("2012-10-15");
            items.add("2012-10-20");
            items.add("2012-11-30");
            items.add("2012-11-28");
        }

        adapter.setItems(items);
        adapter.notifyDataSetChanged();
    }
};
}

日历适配器。JAVA

private Context mContext;
private java.util.Calendar month;
public GregorianCalendar pmonth; // Istanzia un calendario per il mese precedente
/**
 * calendar instance for previous month for getting complete view
 */
public GregorianCalendar pmonthmaxset;
private GregorianCalendar selectedDate;
int firstDay;
int maxWeeknumber;
int maxP;
int calMaxP;
int lastWeekDay;
int leftDays;
int mnthlength;
String itemvalue, curentDateString;
DateFormat df;

private ArrayList<String> items;
public static List<String> dayString;
private View previousView;

public CalendarAdapter(Context c, GregorianCalendar monthCalendar) {
    CalendarAdapter.dayString = new ArrayList<String>();
     Locale.setDefault( Locale.US );
    month = monthCalendar;
    selectedDate = (GregorianCalendar) monthCalendar.clone();
    mContext = c;
    month.set(GregorianCalendar.DAY_OF_MONTH, 1);
    this.items = new ArrayList<String>();
    df = new SimpleDateFormat("yyyy-MM-dd", Locale.US);
    curentDateString = df.format(selectedDate.getTime());
    refreshDays();
}

public void setItems(ArrayList<String> items) {
    for (int i = 0; i != items.size(); i++) {
        if (items.get(i).length() == 1) {
            items.set(i, "0" + items.get(i));
        }
    }
    this.items = items;
}

public int getCount() {
    return dayString.size();
}

public Object getItem(int position) {
    return dayString.get(position);
}

public long getItemId(int position) {
    return 0;
}

// create a new view for each item referenced by the Adapter
public View getView(int position, View convertView, ViewGroup parent) {
    View v = convertView;
    TextView dayView;
    if (convertView == null) { // if it's not recycled, initialize some
                                // attributes
        LayoutInflater vi = (LayoutInflater) mContext
                .getSystemService(Context.LAYOUT_INFLATER_SERVICE);
        v = vi.inflate(R.layout.calendar_item, null);

    }
    dayView = (TextView) v.findViewById(R.id.date);
    // separates daystring into parts.
    String[] separatedTime = dayString.get(position).split("-");
    // taking last part of date. ie; 2 from 2012-12-02
    String gridvalue = separatedTime[2].replaceFirst("^0*", "");
    // checking whether the day is in current month or not.
    if ((Integer.parseInt(gridvalue) > 1) && (position < firstDay)) {
        // setting offdays to white color.
        dayView.setTextColor(Color.WHITE);
        dayView.setClickable(false);
        dayView.setFocusable(false);
    } else if ((Integer.parseInt(gridvalue) < 7) && (position > 28)) {
        dayView.setTextColor(Color.WHITE);
        dayView.setClickable(false);
        dayView.setFocusable(false);
    } else {
        // setting curent month's days in blue color.
        dayView.setTextColor(Color.BLUE);
    }

    if (dayString.get(position).equals(curentDateString)) {
        setSelected(v);
        previousView = v;
    } else {
        v.setBackgroundResource(R.drawable.list_item_background);
    }
    dayView.setText(gridvalue);

    // create date string for comparison
    String date = dayString.get(position);

    if (date.length() == 1) {
        date = "0" + date;
    }
    String monthStr = "" + (month.get(GregorianCalendar.MONTH) + 1);
    if (monthStr.length() == 1) {
        monthStr = "0" + monthStr;
    }

    // show icon if date is not empty and it exists in the items array
    ImageView iw = (ImageView) v.findViewById(R.id.date_icon);
    if (date.length() > 0 && items != null && items.contains(date)) {
        iw.setVisibility(View.VISIBLE);
    } else {
        iw.setVisibility(View.INVISIBLE);
    }
    return v;
}

public View setSelected(View view) {
    if (previousView != null) {
        previousView.setBackgroundResource(R.drawable.list_item_background);
    }
    previousView = view;
    view.setBackgroundResource(R.drawable.calendar_cel_selectl);
    return view;
}

public void refreshDays() {
    // clear items
    items.clear();
    dayString.clear();
    Locale.setDefault( Locale.ITALY );
    pmonth = (GregorianCalendar) month.clone();
    // month start day. ie; sun, mon, etc
    firstDay = month.get(GregorianCalendar.DAY_OF_WEEK);
    // finding number of weeks in current month.
    maxWeeknumber = month.getActualMaximum(GregorianCalendar.WEEK_OF_MONTH);
    // allocating maximum row number for the gridview.
    mnthlength = maxWeeknumber * 7;
    maxP = getMaxP(); // previous month maximum day 31,30....
    calMaxP = maxP - (firstDay - 1);// calendar offday starting 24,25 ...
    /**
     * Calendar instance for getting a complete gridview including the three
     * month's (previous,current,next) dates.
     */
    pmonthmaxset = (GregorianCalendar) pmonth.clone();
    /**
     * setting the start date as previous month's required date.
     */
    pmonthmaxset.set(GregorianCalendar.DAY_OF_MONTH, calMaxP +1);

    /**
     * filling calendar gridview.
     */
    for (int n = 0; n < mnthlength; n++) {

        itemvalue = df.format(pmonthmaxset.getTime());
        pmonthmaxset.add(GregorianCalendar.DATE, 1);
        dayString.add(itemvalue);

    }
}

private int getMaxP() {
    int maxP;
    if (month.get(GregorianCalendar.MONTH) == month
            .getActualMinimum(GregorianCalendar.MONTH)) {
        pmonth.set((month.get(GregorianCalendar.YEAR) - 1),
                month.getActualMaximum(GregorianCalendar.MONTH), 1);
    } else {
        pmonth.set(GregorianCalendar.MONTH,
                month.get(GregorianCalendar.MONTH) - 1);
    }
    maxP = pmonth.getActualMaximum(GregorianCalendar.DAY_OF_MONTH);

    return maxP;
}
}

共有2个答案

宿景曜
2023-03-14

首先更改所有区域设置。把我们带到现场。因为美国日历从周日开始,英国日历从周一开始

在CalendarViewFragment中从周一开始日历

在setNextMonth()中更改

月getActualMinimum(Gregorianalendar.月),1);到下个月。getActualMinimum(Gregorianalendar.MONTH),日历。星期六);

在setPreviousMonth()中更改

月getActualMaximum(Gregorianalendar.月),1);到下个月。getActualMaximum(Gregorianalendar.MONTH),日历。星期六);

而在这场变革中

月集合(Gregorianalendar.DAY_OF u MONTH,1);到下个月。套装(公历,日历,日历,星期六);

澹台鸿光
2023-03-14

解决方案:

在日历适配器中。爪哇:

更改为:

month.set(GregorianCalendar.DAY_OF_MONTH, 1);

month.set(GregorianCalendar.DAY_OF_MONTH, Calendar.SATURDAY);

在CalendarV中iew.java方法setPreviousMonth和setNextMonth:

来自:

month.getActualMaximum(GregorianCalendar.MONTH), 1);
month.getActualMinimum(GregorianCalendar.MONTH), 1);

致:

month.getActualMaximum(GregorianCalendar.MONTH), Calendar.SATURDAY);
month.getActualMinimum(GregorianCalendar.MONTH), Calendar.SATURDAY);
 类似资料:
  • 问题内容: 我有一个小问题,我正在开发一个应用程序,我需要将每周的开始日期从星期一更改为另一个(星期四,星期六)。在Android中这可能吗,我需要计算周的开始及其知道日期的结束。(例如,星期几从星期四开始) 注意:我只是android开发的初学者。这是我的代码SimpleDateFormat dateformate = new SimpleDateFormat(“ dd / MM”); 使用上面

  • 我有一个小问题,我正在开发一个应用程序,我需要将一周的开始日从星期一更改为另一个(星期四,星期六)。这在android中可能吗,我需要计算一周的开始和结束知道日期。(例如,一周从星期四开始) 注意:我只是android开发的初学者。这是我的代码SimpleDataFormat DateFormat=new SimpleDataFormat(“dd/MM”); 使用上面的代码,我得到了结果,但星期一

  • 我需要在我的dim_date中添加新的业务wee,实际上我有一个月中的星期,如下表所示,每7天计算一次。 但是对于这个商业周专栏,一周应该从星期一开始,到星期日结束,即使第一周只有一天(当一个月从星期日开始时),但如果月份从星期五开始,我应该将其视为该月的第一周。 你有什么建议来计算这个吗?谢谢

  • 也许我想多了。我想每周一上午9点发送本地通知,直到满足某些条件。我知道这可以通过设置的和组件来完成。我遇到的问题是我将传递给的值取决于正在使用的。如果我理解正确,则取决于用户的设置。例如,如果用户的日历周从周日开始,我会传递1到,但如果一周从周六开始,我会传递2。 我的问题是,我该如何解释时区、夏令时和周开始日之类的事情?

  • 问题内容: 我在这个问题上看到了一些变体,但我相信这个问题尚未得到解答。 我需要获取一周的开始日期和结束日期,并由年份和星期数选择(而不是日期) 例: 输入: 输出: 返回值将类似于一个数组,其中第一个条目是星期开始日期,第二个条目是结束日期。 可选:当我们需要时,日期格式必须为(正常日期格式,无前导零。 我尝试编辑几乎可以完成我想要的功能,但是到目前为止我还没有运气。 请帮帮我,谢谢。 问题答案

  • 用户可以像这样在手机中设置他们的自定义开始日期。再加上不同的文化,一周开始的日子也不同: 澳大利亚,英国:周日,周一。。。,星期六 中国:周一,周二。。。,星期日 这意味着在开发日历功能时,我们可能有许多不同的一周中的日子从(从左到右)开始我们的日历,以使用户体验最佳。 我们可以定制日历,以确定一周中的具体开始日期: 问题在于将我的自定义日历更新为用户的系统日历。 当我使用Calender(从用户